Product Description
Australian made Stainless Steel Rheem Stellar 315 Litre Stellar Hot Water System –Â Supplied & Installed Sunshine Coast & Brisbane
Next Business Day Deliver if ordered before 12PM
The Rheem Stellar 315 Litre Stellar Electric Hot Water System is a smart investment for large sized families with a high demand for hot water
Why choose a Rheem 315 Litre Stellar hot water system?
Stainless Steel hot water cylinders like the Rheem Stellar 315L offer several benefits:
- Durability: Resistant to corrosion and rust, ensuring a longer lifespan.
- Lightweight: The Rheem Stellar are approx. 42% lighter than the traditional storage hot water system – This system only weighs 45kg!
- Efficiency: Better heat retention, reducing energy costs.
- Health: Stainless steel is a sanitary material, reducing the risk of water contamination.
- Low Maintenance: Requires less maintenance due to its sturdy construction and no anode!
- Superior Warranty: Rheem boasts a 3 Year Labour warranty on the Cylinder, instead of 1 Year for the normal Ultranamel Rheem Hot water systems
-
Dual handed cold water connections, a hot water connection at the top of the water heater.
-
Stainless steel cylinder and water fittings
-
No anode — saves on maintenance and service costs
-
Money saving — designed for off-peak energy rates.
-
Made in Australia
What is included in the Rheem Stellar 315 Litre hot water valve Kit?
1x 15mm Non-Return Isolating Valve (AVG or RMC Brand)
1x 15mm Tempering Valve (AVG or RMC Brand)
1x 15mm Pressure Reduction Valve (AVG or RMC Brand)
1x 15mm Expansion Control Valve (AVG or RMC Brand)
1x Valve Lagging Kit
What is a ‘standard’ Rheem Stellar 315 Litre install?
- Supply new hot water system – Normally day prior to installation
- Isolate water service and disconnect existing hot water system
- Electrical disconnect & reconnect (only)
- Install new Valves (if selected)
- Position new hot water system on existing base and connect to existing water service
- Run PTR & ECV Drain lines in accordance to Australian Standards
- Lag copper pipework and secure according to AS3500
- Disposal of existing hot water system & rubbish
- Submit Form 4 to local Council
Please note:
– If further work outside this scope is required, additional costs will be chargeable to the customer at the discretion of the attending technician(s)
– Hot water system must be on a stable base elevated above the finished ground to prevent pooling of water around the hot water unit, supply of a base will incur additional costs
– If drain lines are required to be extended or non-complaint, additional costs will incur
– If the hot water system needs to be relocated, additional costs will incur
– If extra valves require replacing, additional costs will incur – This is at the discretion of the attending plumber
– If the electrical circuit, RCD or other components need to be upgraded or replaced to be compliant, additional costs will incur
For further information on Inclusions & Extras please click – HERE
-
12 years cylinder warranty*
-
3 years labour on cylinder*
-
1 year parts and labour warranty*