Product Description
Experience a steady supply of hot water with the Rheem 250 Litre Hot Water System –Â Supplied & Installed Sunshine Coast – All Valves Included with installs!

-
Easy Like for Like replacement – common footprint and fitting locations to older model electric water heaters ensures an easy changeover
-
Dual handed fittings – provides installation flexibility
-
Exclusive Rheem Ultranamel® Class Y enamel protects the cylinder with a tough, durable coating.
-
Thicker sacrificial anode – provides additional protection for cylinder against water borne contaminants
-
Suitable for connection to lower cost tariffs – resulting in lower running costs
-
Manufactured in Australia
What is a ‘standard’ Rheem 250 Litre Hot Water System install?
– Disconnection of Electrical Service & Water Services to existing Hot Water System
– Position hot water system on EXISTING (compliant) support base
– Replace & Install the following 15mm valves
-Tempering Valve Safety device limiting temperature to 50deg
(mandatory by law)
– Isolation Valve (Isolates water to new HWS and prevents backflow)
– Pressure Reduction Valve (Ensures water pressure to the HWS is
limited to 500kpa, this protects the unit and required for warranty
purposes)
– Expansion Control Valve Another valve required by QLD law for over
pressure protection upon heating
– Lag copper water services & valves
– Electrician to reconnect hot water system in accordance to Australian
Standards WITH new isolator
– Ensure PTR & Expansion control valve discharge lines can operate in
accordance with plumbing standards (AS3500)
– Test & commission new heat pump hot water system
– Educate customer on terms of warranty, correct operation of hot water
system valves and the new hot water system
– Dispose of all rubbish and submit Form 4 to QBCC

Not included in a standard install:
– Extension of existing water, discharge drain lines or electrical services
– Relocation of hot water system
– Supply of new support base
– Electrical circuit or circuit board upgrades
– Difficult access or dangerous work requiring two men will incur additional labour costs depending on the site
– Concrete cutting or excavation
– Gas work outside of the scope of work
Please note:
– If further work outside this scope is required, additional costs will be chargeable to the customer at the discretion of the attending technician(s)
– Hot water system must be on a stable base elevated above the finished ground to prevent pooling of water around the hot water unit, supply of a base will incur additional costs
– If drain lines are required to be extended or non-complaint, additional costs will incur
– If the hot water system needs to be relocated, additional costs will incur
– If extra valves require replacing, additional costs will incur – This is at the discretion of the attending plumber
– If the electrical circuit, RCD or other components need to be upgraded or replaced to be compliant, additional costs will incur
For further information on Inclusions & Extras please click – HERE
-
12 Years on cylinder*
-
1 Year labour warranty on the cylinder*
-
1 Year parts & labour*
Contact Us